After painting the walls yesterday all I have to do now to prepare the space was to paint the floor. During may discussion with the technicians on Tuesday I was told that I should paint the floor on friday as although the paint is advertised as “touch dry in two hours” it would be more like two days.
The paint covered the floor well all the paint marks that was on the floor was all covered. there are parts of the floor which is slightly uneven however this will work well with the work, I have been thinking about placing gravel inside the space to create an uneven surface this only adds to this idea.
uneven surface in entrance
Comments